banner

Opobo Transmission Line Project

Sector: Power Generation
Client: Niger Delta Development Commission
Location: Ikot Abasi
Project Date:

Details: The design and construction of a 132kV overhead line from Ikot Abasi-Opobo including a 1,000m river crossing, 2 X 7.5MVA Transformers, 33kV Sub-stations and all protection and operation equipment. Provisions is also made to provide distribution electricity supplies and sub-stations for Ogbia, Nembe, Igbogene and Joinkrama with Twon Distribution to Akinima, Ogegberi, Isua, Mbiama, Odan, Ususu and Akipelai. Value: N4.5 Billion plus import duty. (£15 Million).

For more information please contact: Engr. Emeka, Sr. Electrical Engineer, NDDC +234 80 3310 7830

Warning, This website is designed to use javascript, to get the full features please re-enable javascript!